Service
|
Monthly
cost,
UAH incl. VAT
|
Installation
cost,
UAH incl. VAT
|
Explanation
|
1
|
Colocation of APC Netshelter SX rack
42U, width 600mm
|
12,000
|
12,000
|
The basic configuration includes:
- Optical part: H+S Ianos lite cassette, 1 module for 12 LC/UPC to MMR (expandable, see item 6)
- Power part: 2 * PDU APC8858 from 2 power sources, 18 C13 sockets, 2 C19 sockets (3kW max). Every additional 1kW — 3000 UAH/month.
Additional configurations are available upon request
|
2
|
Colocation of ½ APC Netshelter SX rack
42U, width 600mm
|
7,500
|
10,000
|
The basic configuration includes:
- Optical part: H+S Ianos lite cassette, 1 module for 12 LC/UPC to MMR
- Power part: 2 * PDU APC8858 from 2 power sources, 18 C13 sockets, 2 C19 sockets (1.5kW max)
|
3
|
Colocation of APC Netshelter SX rack
42U, width 800mm
|
15,000
|
15,000
|
The basic configuration includes:
- Optical part: H+S Ianos lite cassette, 1 module for 12 LC/UPC to MMR (expandable, see item 6)
- Power part: 2 * PDU APC8858 from 2 power sources, 18 C13 sockets, 2 C19 sockets (3kW max)
Additional configurations are available upon request
|
4
|
Colocation 1U
|
1,000
|
1,000
|
For telecommunications equipment only
|
5
|
Electricity consumption
|
Consumption
* LEZ * 1.7
|
–
|
Actual consumption * LEZ tariff * 1.7
|
6
|
Fiber extension between
cabinet and MMR, 12 fibers
|
0
|
5,000
|
Additional 12 fibers from the rack to MMR
|
7
|
Cable entry into DC
(pre-MMR)
|
1.20
(per 1U)
|
2,000
|
Installation fee includes the cost of the patch panel (ODF).
Fiber works (80 UAH/fiber) or technical supervision (1000 UAH) is charged separately.
Up to 10m cable reserve allowed
One patch panel – one cable
Cross-connection between patch panels in pre-MMR is allowed only within one patch panel
|
8
|
Optic cable placement in
MMR (H+S cassette
24 LC/APC)
|
1.20
(per 1U)
|
9,900
|
Placement of client's cable in MMR
Includes all necessary materials and works
|
9
|
Cable routing from
pre-MMR to DC cabinet,
every 12 fibers
|
0
|
2,000
|
Up to 10m, then 150 UAH/m, 24-fiber cable
(route 22–25m depending on cable entry)
|
10
|
Patch cross-connection
|
250
|
1,800
|
Per one connection (1 or 2 fibers)
|
11
|
Remote hands, business hours
|
0
|
500 UAH/hour
|
Minimum 1 hour, simple tasks up to 10 minutes — free of charge
|
12
|
Remote hands, non-business
hours
|
0
|
1,000 UAH/hour
|
Minimum 2 hours
|
13
|
Optical fiber lease to sites:
41 Doroshenka St. (UARNET)
15 Verbova St. (Omega-Telecom)
42 Sakharova St. (Infocom)
6 Buika St. (Astra)
|
1,000
|
1,000
|
per fiber
|
14
|
Optical fiber lease to site at 200 Khmelnytskoho St. (Atrakom)
|
1,500
|
1,500
|
per fiber
|
15
|
Optical fiber lease to site at 45 Stepanivny St. (Elektron)
|
500
|
500
|
per fiber
|
16
|
Optical fiber lease to site at 11 Sklyana St. (Astra)
|
200
|
200
|
per fiber
|